Health, Safety and Environmental Protection
Our company is committed to a safe and healthy workplace and to minimize its impact on the environment, The company has a well-developed HSE Management System and it will be applied to this project.
A project HSE Plan is being developed which will be augmenting this Project execution plan (The HSE Plan will be provided after the approval of the execution plan. This plan is developed in conjunction with the client and will where necessary included elements of the clients HSE management system requirement. Specific HSE Plan with HEMP (Hazard and Effect Management Process) will be provided and followed during the execution. Nature of HSE activities will be clearly defined in the Project HSE Plan which will be supported by company HSE Manual.
The Project HSE Plan will mainly focus the following;
Also the following eight elements of HSE Management System will be monitored during the execution of the project.
OSS-500 Process Technology
The solid residue will be transferred into OSS-Process technology, The oil separating system blast oil sludge or oil waste with superheated steam to a supersonic speed of up to 2 mach. The speed and high temperature of the steam injection breaks the material down into its separate components; Oil, Water and sediments, These are then separated, cooled and collected.
The oil recovered is equivalent to middle distillate;
the remaining solids have less then 0.5 % oil content.
Oil content in effluent water is < then 100 ppm or Client requirements.
Water content in Oil is < then 1%
From the water separating tank, the skimmed oil will go to oil tanks. The oil from the oil tanks will be given back to Client.